Supply, Installation & Commissioning of LED Street Lighting System — Phase II

Dhaka North City Corporation (DNCC)·Est. BDT 245,000,000·OTM (Open Tendering Method)
Verdict

You can bid · 2 gaps to close before submission

Annual turnover, similar-work experience, and registrations all check out. Two remediable gaps (audited FY2024-25 + bank solvency refresh) block submission today but are closeable within a week.

AI-assisted assessment — verify against the tender documents before acting. Final call is yours.

Bid security
BDT 4,900,000
2% · 150d
Submission
Jun 18, 2026
21 days left
Bid validity
120d
from submission
78
fit / 100
Fit score
Blocking gaps
  • Audited financials for FY2024-25 not yet on file
Remediable gaps
  • Bank solvency certificate expired 2 months ago — refresh required
  • Key electrical engineer's BPDB clearance expired — renewal needed
Required documents12 items
Similar-work requirementITB Section 4.2.1
Min projects1
Min single valueBDT 120,000,000
Years look-back5

At least one LED street-lighting or similar municipal-scale electrical project of BDT 12 crore+ completed within the last 5 years.

Financial capacityITB Section 4.3 · BDS Clause 4.3(b)
Min turnoverBDT 180,000,000
Min working capitalBDT 30,000,000
Bank solvencyRequired
PPR 2008 compliance
Rule 28Tender Security (Bid Security)BLOCKING

Per Rule 28(1), tender security must be 2% of estimated value. The ITB specifies BDT 49,00,000 in Bank Guarantee or Pay Order format with 150-day validity.

Fix: Arrange BG/PO of BDT 49 lakh from a Schedule-1 commercial bank, validity ≥150 days from submission.

Rule 23Eligibility of TenderersPASS

Your registered firm meets the eligibility criteria laid out in Rule 23 — turnover, similar-work, and registration thresholds are satisfied.

Rule 64Method of ProcurementPASS

Open Tendering Method (OTM) is the correct method for procurements above BDT 5 crore per Rule 64 — this tender at BDT 24.5 crore is appropriately routed.

Rule 95Conflict of InterestINFO

Rule 95 requires bidders to declare any current or past relationships with the PE's key personnel. Make sure your tender includes a clean COI declaration.

Fix: Attach standard PPR-3 form COI declaration with your bid envelope.

Rule 88Bill of Quantities (BOQ)WARNING

Per Rule 88, all BOQ line items must match the technical specifications. The ITB references BSTI 2019 LED fixture standards — verify each rate against the current BSTI compliance scope.

Fix: Cross-check 12 BOQ lines against your BSTI compliance certificate before submission.

Analyst summary

DNCC's Phase II LED street-lighting tender (BDT 24.5 crore, 4,500 fixtures across 18 routes) is a strong fit for your firm. Your turnover and similar-work credentials clear the bar comfortably; two paperwork gaps (FY2024-25 audited financials + bank solvency refresh) need closing within the first week of the 21-day window. Bid security of BDT 49 lakh in BG/PO format is required.

Curated demo · all figures from a representative DNCC-style tender.
Extracted files6 files
  • ITBITB_DNCC_LED_PhaseII.pdf4.2 MB
  • BOQBOQ_LED_Phase_II.xlsx0.3 MB
  • GCCGCC.pdf1.8 MB
  • SCCSCC.pdf0.6 MB
  • TECH_SPECTech_Spec_LED_BSTI_2019.pdf2.1 MB
  • ANNEX_FORMATAnnex_PPR3_Forms.pdf0.9 MB

Clarification deadline: Jun 4, 2026